In any operation of the transfer equipment.Ī properly installed interlock seems to meet this requirement, so there's nothing here to prevent one. Inadvertent interconnection of normal and alternate sources of supply Transfer equipment shall be suitable for the intended use and designed and installed so as to prevent the So in the case of an interlock, would the generator have to be rated to supply the whole house, or only the items the user wants to run (which could change at any time)?ħ02.6 Transfer Equipment. The user of the optional standby system shall be permitted to Rating for the supply of all equipment intended to be operated at one Where manual transfer equipment is used, an optional standby system shall have adequate capacity and This has inspired me to read through article 702 Optional Standby Systems of the NEC (which is short so it wasn't much effort), where I found the following items that seem relevant. There have been some questions on the site lately, that reference using interlock kits with portable generators.
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |